OSK-ShipTech A/S and OSK-Offshore A/S |
|
|
| |
|
 Consulting Naval Architects and Marine Engineers OSK-ShipTech A/S (formerly Ole Steen Knudsen A/S), providing reliable marine consultancy services since 1966. Overall Project Coordination from Ship Design to Final Delivery.
- concept and configuration
- design and engineering
- construction drawings to the approval of national authorities and classification societies
- specifications and contract documents
- tendering and negotiations
- building supervision and delivery
- financing and budget control
- warranty, operation and maintenance
|
|
| |
|
| AARHUS |
COPENHAGEN |
|
OSK-ShipTech A/S
Balticagade 15, 2 fl.
8000 Århus C
|
OSK-ShipTech A/S
Bryggervangen 55, 1 tv.
2100 København Ø
|
|
Tel:
Fax:
E-mail
|
|
Tel:
Fax:
E-mail
|
45 76 42 10
45 76 42 20
mail@osk-shiptech.com |
|
|
|
| |
|
News, jobs and appointments at OSK-Offshore A/S, Copenhagen and Hamburg - see more>> |
|
|
|
|
|
|
| |
|
April 2013 - New address for our Copenhagen Office
As of 2nd April 2013, OSK-ShipTech A/S' address in Copenhagen will be:
OSK-ShipTech A/S , Bryggervangen 55, 1 tv, 2100 Copenhagen Ø
Main telephone number and e-mail addresses remain unchanged. However, direct numbers will no longer be in use, so we advise you to use mobile numbers where possible.
|
| |
|
|
|
|
| |
|
March 2013 - Contract signed for RoPax Ferry for Samsø
OSK-ShipTech's assignment to prepare the tender design, conduct an EU tender and assist in contract negotiations was concluded on Monday the 18th March 2013, when Samsoe Kommune signed a contract with the Polish shipyard Remontowa, Gdansk for construction of a new passenger ferry.
Present at the signing were from left:
Mr. Jan Paszkowski, Remontowa, Mayor of Samsø Mr. Jørn C. Nissen, Mr. Andrzej Wojtkiewicz, Remontowa.
Photo: Jens Øster-Mortensen
The ferry which will be driven by LNG will be the first of its kind on domestic routes in Denmark and reflects the "green profile" which is characteristic of the island of Samsø.
The ferry is designed as an open double-ended ferry with capacity for up to 160 cars and 600 passengers. Propulsion will be by four azimuth rudder propellers electrically driven from dual fuel LNG/MGO generator sets.
|
|
|
| |
|
|
|
Photo from signing of contract between Samsø Kommune and Remontowa on 18th March 2013:
from left: Mr. Jan Paszkowski and Mr. Andrzej Wojtkiewica, Remontowa, Anders J. Jørgensen, Head of Administration, Samsø Kommune and Mayor Jørn C. Nissen.
Foto: Jens Øster-Mortensen |
| |
|
|
|
|
| |
|
|
|
February 2013 - RoPax Ferry for service between Sælvig and Hou
Samsoe Kommune has decided to become a ferry owner and build a new passenger ferry. OSK-ShipTech A/S has therefore been commissioned to carry out the prequalification of shipyards, prepare the tender design and assist in floating a EU-tender among prequalified shipyards. Pre-contract meetings with prequalified bidders will be initiated shortly in accordance with EU-tender procedure.
The ferry is designed as an open double-ended ferry with capacity for up to 160 cars and 600 passengers. Propulsion will be by four azimuth rudder propellers electrically driven from dual fuel LNG/MGO generator sets. |
| |
|
|
|
|
| |
|
 Research Vessel SANNA for PINNGORTITALERIFFIK, Greenland's Institute of Natural Resources
In March, the research vessel SANNA was made ready for her trip from Skagen to Nuuk in Greenland, where the official christening ceremony will take place on 13th April 2012. The ship is an OSK-ShipTech A/S design and has been built at Karstensens Shipyard in Skagen. The main dimensions are: L: 32 metre, draught 4.8 metre. The ship is intended for carrying out fishing operations as well as climatic investigations along the west coast of Greenland and can accommodate a crew of 6 and up to 10 scientists.
See the article from the Danish fishery magazine,Fiskeri Tidende, week 11, 2012>>
See reference sheet>>
See photos>>
|
| |
|
|
|
|
| |
|
Lo-Noise and OSK-ShipTech reduce the noise during installation offshore wind turbines
With a new and innovative technology, it is now possible to comply with existing legislation on noise reduction during installation of offshore wind turbines.
More Info >> |
| |
|
|
|
|
| |
|
Makeover of Beira Port, Mozambique
The vessels for the project for the improvement of port facilities in Beira, Mozambique, are progressing and the first one is being delivered in the begining of the new year.
More info>>> |
| |
|
|
|
|
| |
|
|
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|